| | | | | | | | BRAZOS COUNTY
BRYAN, TEXAS |
| | | | | | | | DEPARTMENT:
| Purchasing
| NUMBER:
|
|
|
| | | | | | | | DATE OF COURT MEETING:
| 4/21/2026
| ITEM:
| Permission to Advertise RFP CIP 26-554 Dick Elliot Road Reconstruction.
|
|
| | | | | | | | | NOTES/EXCEPTIONS: | The reconstruction of Dick Elliott Road is necessary to address aging pavement conditions, inadequate structural capacity, and localized drainage deficiencies that are contributing to ongoing maintenance needs and reduced ride quality. This corridor serves as an important connection from Old San Antonio Road and experiences regular local traffic, making a full-depth rehabilitation a more cost-effective long-term solution than continued patching. The project will restore pavement integrity through reclamation and new HMAC surface layers, improve drainage performance with upgraded culverts, ditch grading, and erosion protection, and enhance roadway safety through the addition of guardrail, proper end treatments, signage, and pavement markings. Overall, this reconstruction will provide a durable, safer roadway while reducing lifecycle maintenance costs and improving reliability for the traveling public.
|
|
|